We – EPG Group the biggest gearbox & motors , couplings and gears manufacturing unit in China with 5 distinct branches. For more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
High-Tech Rubber Dispersion Mixer
Application:
This Rubber Kneading Equipment is mainly employed for plasticizing and mixing of normal rubber, artificial rubber, reclaimed rubber and plastics, foaming plastics, and utilized in mixing of various the degree resources.
Introduction:
one. Mixing Chamber
It is made up of a “w” form human body and two aspect boards created of higher quality metal plates by means of extrusion forming and welding, which are jacked to get the flow of cooling water or steam. It is plated with difficult chrome on its inside partitions.
two. Standard Observe Pump
Timing injection pump to the sealing method on a regular injection of hydraulic oil, lubrication sealing influence.
3. Thermal Resistance (or thermal pair)
There is a plug-in thermal resistance or thermal pair in center part of the base of the chamber to be related to electrical system to examine and handle the mixing temperature.
four. Rotor
It is made to the hollow blades of banbury type. The hollows are connected with axial gap of rotor shaft employed as cooling or heating passage. The prime edges and the aspect faces of blades are floor welded with hard alloy and ground, then plated with tough chrome and polished.
5. Cooling/heating System
A widespread piping technique is adopted for either cooling or heating materials in mixing operation. By way of the system cooling drinking water or steam is fed in a few techniques to the cavities of the rotors blades, – the jackets of the mixing chamber and the prime ram.
6. Tilting System
It is composed of a rotor with brake, cycloidal gear reducer, TP variety worm and worm equipment, and many others. It is capable to actuate the mixing chamber tilting by 140° Close to the front rotors.
7. Dust Stop Unit
At the joint among the top of mixing chamber and the cantilevered arm of the equipment frame, the dust sealing assembled with curved slotted partings are employed for acquiring an outstanding and reliable sealing purpose. The conclude face of the rotor is sealed by conclude make contact with sealing with non oil-lubrication and it seals properly and is wear-resistance and resilient.
eight. Primary Driving System
The component is created up with primary motor, hard equipment reducer, connecting gears. It realizes odd-speed rotation of rotors with running experience one particular other.
nine. Pneumatic management program
Pneumatic control technique is controlled by PLC get. A bi-directional air cylinder helps make the ram up or down. In scenario of the above load takes place when mixing chamber, the prime ram can be raised routinely or manually if necessary, so as to protect motor from overloading.
10. Electrical Manage Method
Imported PLC unit and electric control components which are all imported products or imported engineering merchandise are adopted in the electrical management method as to elevate control dependability.
11. Dust Sealing System
Mixing chamber catchy interface rack cantilever the oil dust seals and timing result oiling dust, special composition, the use of copper resources, great sealing functionality, no leakage of the glue, powder leakage, do not pollute the environment, but also has simple routine maintenance and extended provider existence.
Parameter:
Model | X(S)N- 3×32 |
X(S)N- 5×32 |
X(S)N- 10×32 |
X(S)N- 20×32 |
X(S)N- 25×32 |
X(S)N- 35×30 |
X(S)N- 55×30 |
X(S)N- 75×30 |
X(S)N- 110×30 |
X(S)N- 150×30 |
X(S)N- 200×30 |
Complete Volume Of Mixing Chamber(L) |
8 | 15 | 25 | 45 | fifty five | seventy five | a hundred twenty five | a hundred and seventy | 250 | 325 | 440 |
Wor ept Quantity Of Mixing Chamer(L) |
three | 5 | 10 | twenty | 25 | 35 | fifty five | seventy five | 110 | a hundred and fifty | 200 |
Driving Motor Power(KW) |
five.five | eleven | 22 | 37 | 37 | fifty five | 75 | 110 | 185 | 220 | 280 |
Tilting Motor Energy(KW) | .55 | 1.1 | 1.1 | one.5 | one.5 | two.2 | 2.2 | four | five.five | 11 | eleven |
Tilting Angle(°) | a hundred and forty | 140 | one hundred forty | 140 | a hundred and forty | one hundred forty | 140 | 140 | one hundred forty | 135 | a hundred thirty five |
Rotating Speed of Rotor(Front/Rear) (r/min) |
32/24.five | 32/23.five | 32/twenty five | 32/27 | 32/24.five | thirty/24.five | 32/24.5 | 32/24.5 | 32/24.five | thirty/24.five | 30/24.five |
Pressure of Cooling Water(MPA) | .2-.4 | .2-.4 | .2-.4 | .2-.four | .2-.four | .3-.4 | .3-.four | .3-.four | .3-.four | .3-.4 | .3-.4 |
All round Dimension (LxWxH)(mm) | 2000x 1000x 2220 |
1850x 1200x 2280 |
2450x 1650x 2350 |
2675x 1650x 2560 |
2675x 1650x 2560 |
3200x 1900x 2950 |
3230x 1927x 2958 |
3325x 2615x 3105 |
4075x 2712x 3580 |
4250x 2750x 4106 |
4250x 3400x 4215 |
Gross Excess weight(T) | ~two | ~2.one | ~2.1 | ~4 | ~4.5 | ~6.three | ~7.one | ~9.5 | ~14.9 | ~19.five | ~22.five |
FAQ
1. What does your factory do concerning top quality handle?
We pay a lot much more value to quality management from the extremely commencing to the end of production. Each machine will be fully assembled and carefully examined ahead of cargo.
2. What’s the machine high quality promise?
High quality ensure time is one particular 12 months.We pick planet well-known brand name factors to hold our equipment in ideal wor ept situation.
three. Are you ready to give installation and commissioning abroad?How prolonged time will it get?
Indeed, we can provide abroad support and technological help but customer requirements to spend for the value of the installation. Tiny equipment generally normally takes within 2~3 times. Big production line generally requires about thirty days.
4. How can I ept you to provide the right device as I requested?
We will totally supply a excellent high quality device as we discussed and verified in the purchase. The main of our business culture is innovation,good quality,integrity and efficiency. Also we have experienced many excellent cooperation with world well-known rubber production producers.
If you come to our factory, we can present the person around us.
five. How can we go to your facet?
We are located in HangZhou Metropolis, ZheJiang province, China. The title of airport is HangZhou liuting airport. We will pick up you at the airport.
Our Solutions
♦ Our engineers can design and style ept equipment for buyers and deliver them the drawing to confirm. We are constantly on the aspect of saving your expense.
♦ In the method of generation, we will get pictures and deliver to clients for their keep track of the development.
♦ Paperwork this sort of as pac ept record, commercial invoice, and monthly bill of lading and so forth. will be sent following the shipping.
♦ We could provide free of charge English foundation DWG, set up drawing, user information, maintenance handbook and component drawing.
♦ We supply overseas engineer services and support to teach your employees to function the machine.
Welcome your inquiry!
The use of original tools manufacturer’s (OEM) portion figures or trademarks , e.g. CASE® and John Deere® are for reference purposes only and for indicating merchandise use and compatibility. Our firm and the shown substitution parts contained herein are not sponsored, approved, or produced by the OEM.